The Bathroom Remodel Trudges Forward

It's been another long week of working on the bathroom.  Luke spent most of his weeknights running drains and supply lines while I finished the drywall. I didn't bother with pictures because this is boring work that doesn't change the look of the bathroom.

But we did make some visual progress this weekend with getting the floor and shower tiled and installing the sun tunnel.
 The floor looks amazing and we haven't even done the grout yet.

 The shower isn't looking too shabby either.
 We still have a lot of work to do, but hopefully we will be able to use the shower by the end of the week.  In other news the new siding is 80% painted, we're still working on the bathroom and Luke is framing the basement.  The last thing we need is another project so of course I had to go and do this.

900 sq ft of hardwood flooring waiting to be installed.